References

Selected examples of STIM projects

Procter and Gamble, Lagos, Nigeria

Layout and workshop engineering, static analysis, and delivery

  • steel structure: ~ 50 tons metal work and supervision of erection:
  • steel structure : ~ 1.500 tons
  • roof and wall cladding: ~ 31.500 m²

Central Bank Lagos, Nigeria

Engineering, delivery and supervision of steel structure for a Helipad

EGTL – Escravos Gas to Liquid Plant, Nigeria

Layout and workshop engineering, static analysis, delivery and supervision of erection

  • Building steel structure according to British standard: ~ 500 tons
  • Cladding: Mineral Sandwich Panels: ~ 10.000 m²
  • Finishing components: Roller shutter doors, Roof and Wall louvers

Governor's Residence, Uyo, Nigeria

Layout and workshop engineering, static analysis, delivery and supervision of erection

  • Steel structure for building roofs, crux: ~ 70 tons
  • Cladding Alu-Kalzip ~ 9.000 m²

Business Center Tinapa, Calabar, Nigeria

Layout and workshop engineering, static analysis, delivery and supervision of erection

  • Roof steel structure for 52 mall line shops with entertainment building, restaurant: ~ 570 tons, including ~ 110 tons cold rolled purlin
  • Roof cladding for restaurant, facade, ~ 6.500 m²

International Airport Mongomeyen, Equatorial Guinea

Layout and workshop engineering, static analysis, delivery and supervision of erection

  • Cladding Alu-Kalzip ~ 8.000 m²
  • Roof steel structure: ~ 140 tons
  • Metalwork: ~ 100 tons

Balustrade Mercedes Centre, Warsaw, Poland

Engineering, delivery and erection

  • 202 m straight and round glass balustrade made of 12 mm stainless steel 1.4301

Petrol Filling Stations, Dierent Provinces, Nigeria

Engineering and delivery for 30 stations, size 32m x 14m

  • Roof steel structure : ~ 600 tons
  • Roof cladding including aluminum attic panels: ~ 14.000 m²

Petrol Terminal Bonny Island, Nigeria

Layout and workshop engineering, static analysis, delivery and supervision of erection

  • Roof steel structure for 110 houses and schools: ~ 550 tons

Campeon pedestrian bridge Neubiberg, Munich

Layout and workshop engineering, static analysis, delivery and erection

  • 400 m pedestrian walkway covering
  • 180 tons metalwork with conic pipes, conic casted elbows, including 1.600 m² roof cladding form glass and fiber glass scobalit

Floating Petrol Filling Station

Engineering and delivery for 12 Floating Stations, size 32m x14m

  • Roof steel structure: ~ 276 tons
  • Roof cladding: ~ 5.300 m²

Conveyor bridges and transfer towers, granite quarry, Norway

Layout and workshop engineering, static analysis and delivery

  • Steel structure: 940 tons
  • Cladding: ~ 1100 m²

Central Park Entrance Gateway, Pylon railway station canopy, Manchester, Great Britain

Quality control and delivery

  • Bended pipe steel structure: ~ 105 tons, cable supported

German Embassy Madrid, Spain

Engineering, delivery and erection of metalwork

  • canopies, staircases, facade elements: ~ 50 tons

Telekom Center, Munich, Germany

Layout and workshop engineering, static analysis, delivery and erection

  • 10 Pieces emerceny stairs 50 m high: ~ 275 tons

Mobile car showroom, rst step Davos, Swiss

Engineering and delivery

  • Steel structure: ~ 60 tons

Central Bank, Lagos, Nigeria

Delivery of shuttering

  • Steel structure: ~ 27 tons

Tower for Roller Coaster, Orlando, USA

Delivery and quality control

  • Coated steel structure: ~ 110 tons

Wind power plant, Ratzinger Höhe, Germany

Plant design, delivery and erection

  • 10 kw gearless wind power plant